Sunday, April 19, 2009

Yard Work

It all started with the new stones for the walkway. (Which was supposed to be a 20 min. job)



Then we edged and tilled the flower bed to the right of the steps.


After than we edged and tilled the bed to the left of the steps. (Don't mind Juan. He was asking where the dog was.) We still need to get some edging to go between the walkway and the garden.


Finally we dug up some dead grass and put the sod from the flower beds in. Then we put the picnic table on top of the sod so the dog doesn't dig it up up.


Two and half hours later we finally had to go inside because it was starting to rain!

No comments: